Completed Projects

NONAME OF PROJECTNATURE OF WORK
COMMENCEMENT AND COMPLETION
1. Dayabumi Complex Phase 3 Kuala Lumpur
38 storey Tower Block and 8 storey Podium Block 42 storey Ofice Block
a) Supply and Installation of Low Voltage System including Programmable Lighting Control, Telephone and Standby Gen-set
b) Whole Fire Protection Service
Jan 1982 - Feb 1984
2. PNB HQ Building 42 storey office block, Kuala Lumpur
High Tension, Low Tension, Standby Gen-set, Public Address, Telephone & Building
Automation System Services
Jan 1982 - Apr 1984
3.MUIS HQ Building, Kota Kinabalu, Sabah
a) Electrical Services High Tension, Low Voltage Standby Gen-set and Telephone Services
b) Air-cond & Ventilation Services
c) Fire Protection Services
d) Lifts & Escalator Services
e) Plumbing & Drainage Services
Dec 1982 - Jun 1986
4.Sesco HQ Building, Kuching, Sarawak
Electrical, Telephone, Air-Conditioning and Ventilation,Fire Protection and Public Address System
Sep 1983 - Sep 1985
5.Wisma Saberkas, Kuching, Sarawak
High Tension, Low Voltage & Telephone Services
Nov 1983 - Jul 1985
6.Kompleks Karamunsing, Kota Kinabalu, Sabah
Low Tension Services
Feb 1984 - Jul 1985
7.Multi-Storey Car Parking Building, Kuala Lumpur
High Tension, Low Tension, Standby Gen-set and
Telephone Services
Mar 1984 - Aug 1984
8.EPF Building, Sabah
High Tension, Low Tension & Gen-set
Mar 1984 - Jan 1986
9.Wilayah Shopping Centre, Sabah
Electrical, Fire Protection, Plumbing, Telephone and Public Address System
Oct 1984 - Jan 1985
10.Sabah Medical Centre
High Tension, Low Tension, Nurse Call and Intercom System, Master Antenna TV & Public Address, PABX and Telephone & Fire Protection Services
Oct 1984 - Oct 1986
11.Bank Pembangunan Malaysia Berhad, Kuala Lumpur 30 storey 2 blocks Office Building
Electrical Services
Dec 1984 - Jul 1987
12.TSI MED, Cantonment Road, Penang 8 storey 6 levels of Basement Carpark
M & E Works
a) Electrical
b) Air-conditioning
c) Fire Fighting
Jan 1987 - Oct 1987
13.Yaohan, Penang Kompleks Tunku Abdul Rahman
Renovation Works
a) Air Conditioning and
Mechanical Ventilation
b) Fire Fighting Services
c) Electrical, Public Adress
& Telephone Installation
d) Plumbing
Aug 1988 - Oct 1988
14.UOB Plaza 1 Singapore 280 metre high c/w 66 storey & 3 basement intelligent Building
Electrical Installation Works
Jun 1990 - Jun 1992
15.Yamaha Music School, Kelana Jaya
Mechanical & Electrical Services
a) Electrical Installation
b) Airconditioning & Mechanical Ventilation Installation
c) Plumbing & Sanitary Installation
May 1992 - Mar 1993
16.Sarawak Shell BerhadLutong, Sarawak 4 storey main office extension
Supply Installation, Testing and Commissioning of Electrical Installation for Computer Room
Mar 1992 - Jun 1993
17.Petronas Carigali Sdn Bhd Baram Delta Operation (BDO), Miri, Sarawak
Electrical (Low Voltage) Services Installation
Dec 1992 - Jan 1994
18.Sabah Shipyard North of Bay 3 Development
Mechanical Installation
Sep 1993 - Mar 1994
19.MAC Technology Sdn Bhd, Senawang
Mechanical & Electrical Works
Nov 1993 - Mar 1994
20.OUG Shopping Complex (Yaohan) Renovation & Extension to 4 storey carpark at the existing
Mechanical & Electrical Services
a) Electrical Installation
b) Air-conditioning Services
c) Fire Fighting Services
d) Plumbing Services
May 1994 - Aug 1994
21.Labuan Financial Park including Auditorium
- Electrical Services including Decorative Fittings, Dimmers, PA & Audio System
- Aircon, Ventilation & Acoustic System
- Fire Fighting Services
- Sanitary Plumbing & Cold Water Services
Dec 1993 - May 1995
22.Likas View Sdn Bhd 16 storey Commercial cum Residential Development, Kota Kinabalu
a) Plumbing & Sanitary System
b) Fire Protection System
c) Electrical System
Jul 1994 - Sep 1995
23.Menara Kuala Lumpur
Sanitary Plumbing
Jul 1993 - End 1995
24.Kuala Lumpur City Centre (KLCC) Northwest Development Construction of the Petronas Twin Tower (Tower 2)
Electrical Works for Shell & Core
Jan 1994 - Jun 1996
25.Suria KLCC Podium, Retail & Carpark Project
Electrical Services
Jan 1996 - Aug 1997
26.Labuan Financial Park Block 4
Airconditioning & Mechanical Ventilation System, Building Automation System, Fire Fighting & Detection System and Electrical Services
Mar 1996 - Sep 1997
27.Malacca Raya 7-storey Shopping Complex
High Voltage, Low Voltage Electrical, Telephone Standby Generators, Public Address and Fireman Intercom System
Nov 1996 - Sep 1997
28.Menara Landmark Johor Bahru
Air Conditioning Mechanical Ventilation
Jan 1996 - End 1997
29.Petronas Tower Link/ Philharmonic Hall - Petronas Art Gallery
Electrical Services and Audio Visual Services
Nov 1997 - Mar 1998
30.Philharmonic Concert Hall at KLCC Tower
- Electrical Services including Decorative Fittings,
Dimmers, PA & Audio System
- Aircon, Ventilation & Acoustic System
- Fire Fighting Services
- Sanitary Plumbing & Cold Water Services
Feb 1997 - Jul 1998
31.KLCC Tower 2 Skylobby Malaysian Petroleum Club (MPC)
M&E Services
- Airconditioning Services,
- Fire Protection Services &
- Electrical Services
Aug 1998 - Jul 1998
32.Malaysian Petroleum Club (MPC) Petronas Tower 2
Mechanical & Electrical
Services
Nov 1997 - Oct 1998
33.Mitsubishi Corporation Office
Electrical Work
Aug 1998 - Dec 1998
34.NTT MSC Internet Data Centre Building at Cyberjaya Flagship Zone
Electrical Services
Mar 2001 - Sep 2001
35.Menara Great Eastern Life
Design & Installation, Testing and Commissioning of Electrical Services, Car Park Access System, Sound System and Security System
Jun 1999 - Nov 2001
36.Pusat Khidmat Budi Penyayang Malaysia Kepala Batas, Pulau Pinang
Construct and complete Building, Mechanical & Electrical and Infrastructure Works
Aug 2003 - May 2004
37.Proposed Supply, Delivery, Installation, Testing and Commissioning of Electrical and Mechanical Services for Retails Electrical, Load System in Suria KLCC, Mechanical Services for Retails Electrical Load System
in Suria KLCC, Kuala Lumpur
Electrical and Mechanical
Nov 2003 - Jul 2004
38.Proposed Design, Installation and Commissioning of Electrical Services for Isetan at Mid Valley City Phase II Bandaraya Kuala Lumpur
Elecrical Services
Mar 2007 - Sep 2007
39.The Construction and Completion of the Superstructure Main Contract Works for the Proposed Mixed Development on Lot 171 (Lot C) at Persiaran KLCC, Kuala Lumpur City Centre, Kuala Lumpur
Electrical Services
Feb 2009 - Dec 2013
NO
NAME OF PROJECT
NATURE OF WORKCOMMENCEMENT AND COMPLETION
1.ANC 2 storey Sungai Way, Selangor
Electrical, Air-Cond, Piping PA and Fire Services
Dec 1981 - Jun 1982
2.SGS-ATES (M) Sdn Bhd
Electrical Installation
Aug 1984 - May 1985
3.National Car, Proton Saga Plant / Factory, Shah Alam
HT System including Sub-Stationsm, LV, Telephone and PA System
Jan 1984 - May 1985
4.Sony Electronics (M) Sdn Bhd Seberang Prai, Penang
Electrical and Telephone Services
Sep 1987 - Feb 1988
5.Fujitsu Component (M) Sdn Bhd Batu Pahat, Johor
Electrical Services
Aug 1986 - Mid Jan 1989
6.Sony Bangi Phase II Bangi, Selangor
LT Electrical Installation, Telephone, PA System, MATV and Security Services
Sep 1988 - Jun 1989
7.Hitachi Electronic Products Malaysia Bangi, Selangor
Electrical Services
Jun 1989 - Mar 1990
8.Evergreen Heavy Industrial Pasir Gudang, Johor One Block Container Factory, One Block 2 storey Office and One Block 2 storey Canteen
Electrical Services
Oct 1989 - Mar 1990
9.Nitto Denko Shah Alam, Selangor
Electrical Services
Jul 1989 - Jun 1990
10.Kobe Copper (M) Sdn Bhd Shah Alam, Selangor
Electrical and Telephone Services
Feb 1990 - Jun 1990
11.Sony MVP Electronic Bangi, Selangor
Electrical Services
Jan 1990 - Jul 1990
12.Rohm Wako (Kelantan) Phase II Kota Bahru
a) Electrical
b) Air-cond, mechanical and Utilities Services
Feb 1990 - Jul 1990
13.Matsushita Precision Capacitor Sdn Bhd Melaka
Electrical Services
Jul 1990 - Oct 1990
14.Proton Saga Engine Factory Shah Alam, Selangor
Electrical Services
Jul 1990 - Nov 1990
15.Top Thermo Manufacturing (M) Sdn Bhd Klang, Selangor
Electrical Services
Aug 1990 - Dec 1990
16.TDK (M) Sdn Bhd Phase II Nilai, Negeri Sembilan
Electrical Services
Aug 1990 - Dec 1990
17.JVC Phase II Shah Alam
Electrical Services
Aug 1990 - Mid Jan 1991
18.Gunung Printing Ink Factory Shah Alam
Electrical Services
Sep 1990 - Jan 1991
19.Canon Opto (M) Sdn Bhd Phase II Shah Alam, Selangor
Electrical Services
Aug 1990 - Feb 1991
20.Tamura Electronics (T) Sdn Bhd Kemaman, Terengganu
a) Electrical
b) Air-conditioning and Ventilation Services, Cold Water & Sanitary Plumbing and Fire Fighting work
Oct 1990 - Mar 1991
21.JVC Manufacturing Malaysia Shah Alam, Selangor Phase 1 - Extension & Renovation
Electrical Services
Nov 1990 - 10 Apr 1991
22.Canon Camera Malaysia Phase 1 Shah Alam, Selangor
Electrical Services
Mar 1991 - Aug 1991
23.TDK Factory, Phase IV Nilai, Negeri Sembilan
Electrical Works
Mar 1991 - Oct 1991
24.Matsushita Sports Stadium, Shah Alam, Selangor
Electrical Services HV, LV, Lighting & Power, Floodlighting System, PA System, etc.
Dec 1990 - Oct 1991
25.Matsushita Television Co. (M) Sdn Bhd MTV Phase III Shah Alam, Selangor
Electrical Works
Apr 1991 - Nov 1991
26.JVC Electronics Malaysia Sdn Bhd Shah Alam, Selangor
Electrical Works
May 1991 - Nov 1991
27.Nichia (M) Sdn Bhd Shah Alam, Selangor
Mechanical & Electrical Services
Jun 1991 - Nov 1991
28.Matsushita Electronics Corporation (M) Sdn Bhd
Electrical Works
May 1991 - Dec 1991
29.Rohm Wako (K) - Phase III Pengkalan Chepa, Kelantan
Electrical, Air-conditioning & Mechanical Ventilation Services, Cold Water & Sanitary Plumbing Utility Services
Aug 1991 - Dec 1991
30.Shinko Electronics (M) Sdn Bhd Shah Alam, Selangor
Electrical and Telephone Services
Sep 1991 - Dec 1991
31.Nippon Electric, Shah Alam
Electric & Mechanical Services
Oct 1991 - Mar 1992
32.Sumitomo Bakelite Malaysia (SNC Project), Pasir Gudang
Electrical Services
Jun 1991 - Apr 1992
33.Sony Video Factory Phase II, Bangi
Electrical Works & Gen-set
Aug 1991 - Apr 1992
34.Chugoku Marine Paint Pasir Gudang
Electrical Services
Jan 1992 - Jun 1992
35.Nankai Worsted Spinning (M) Sdn Bhd - Phase II (NSM), Semenyih
Mechanical & Electrical Services
Feb 1992 - Jun 1992
36.Matsushita Audio Video Pasir Gudang
Electrical Services
Jun 1991 - Jun 1992
37.Nippon Electric Glass, Shah Alam
Electrical Works
Dec 1991 - Jul 1992
38.PJVM Factory (Phase 3) Shah Alam
Electrical Services
Jan 1992 - Jul 1992
39.ALPS Precision (M) Sdn Bhd, Nilai
Electrical Services
Jun 1992 - Mar 1993
40.ALPS Electric (M) Sdn Bhd, Nilai
Electrical Works
Sep 1992 - Mar 1993
41.Pioneer Technology (M) Sdn Bhd, Muar, Johor
Electrical Works
Sep 1992 - Aug 1993
42.SGS-Thomson Microelectronics Sdn Bhd, Johor
a) Electrical Services
b) Fire Protection
Mar 1993 - Dec 1993
43.Fujikura (Malaysia) Sdn Bhd Subang Hi-Tech , Shah Alam
Electrical & Air-conditioning Services
Aug 1993 - Jan 1994
44.Tylon Phase III Shah Alam
Electrical Installation
Nov 1993 - Mar 1994
45.ALPS Precision (M) Sdn Bhd Phase II Jengka, Pahang
Electrical Installation
Nov 1993 - Apr 1994
46.Hitachi (HELM) Phase 4 - Step 1 Project Johor
Mechanical & Electrical Services
Nov 1993 - Apr 1994
47.Furukawa Factory, Klang MK Project
Electrical Work Plumbing & Fire Protection Air-conditioning & Ventilation
Oct 1993 - May 1994
48.Texas Instruments Factory & Car Park Hulu Kelang
a) 33KV Sub-station
b) 11KV Distribution System
End Jan 1994 - Aug 1994
49.JVC Electronics (M) Sdn Bhd Parts Factory Complex, Phase II, Shah Alam
Electrical Works
Apr 1994 -Oct 1994
50.Canon Shifting & Renovation Work, Shah Alam
Electrical Works
Sep 1994 - Oct 1994
51.Nankai Worsted Spinning (Terengganu) Sdn Bhd
Mechanical & Electrical Services
Jun 1994 - Nov 1994
52.NEG Phase II Shah Alam
Electrical Works
Jun 1994 - Dec 1994
53.NEG Phase III Shah Alam
33kv power supply, 11kv/3.3kv, 11kv/415v sub-station system and generator set installation
Jun 1994 - Dec 1994
54.NEG Phase III Shah Alam
Electrical Works
Sep 1994 - Dec 1994
55.JB District Park Sdn Bhd Warehouse & Office Phase II
Electrical Services
Aug 1994 - Jan 1995
56.Fujitsu Factory Extension Phase II, Shah Alam
Electrical Services
Nov 1994 - Apr 1995
57.Matsushita Audio Video Phase II, Shah Alam
Electrical Services
Feb 1995 - Jun 1995
58.Nankai Worsted Spinning (Terengganu) Sdn Bhd
Mechanical & Electrical Services
Jun 1995 - Sep 1995
59.SNC Industrial Laminates Sdn Bhd, Johor - Phase II
Electrical Services
Mar 1995 - Oct 1995
60.Sumitomo Bakelite Factory Phase II, Shah Alam
Electrical Services
Mar 1995 - Oct 1995
61.Matsushita Television CO. (M) Sdn Bhd, Shah Alam Phase III
Electrical Services
May 1995 - Oct 1995
62.Nippon Electric Glass (M) Sdn Bhd, Shah Alam Phase IV
Electrical Services
May 1995 - Nov 1995
63.Trio-Kenwood Electronics Engineering Sdn Bhd, Pasir Gudang, Johor
Electrical Services
Jun 1995 - Jan 1996
64.Matsushita Audio Video (M) Sdn Bhd - Phase III Pasir Gudang, Johor
Electrical Services
Sep 1995 - Jan 1996
65.Matsushita Electronics Corporation (M) Sdn Bhd, Shah Alam
Electrical Services
Jul 1995 - Feb 1996
66.Nippon Electric Glass (M) Project - Phase IV (CRT Glass Bulb Factory)
Electrical Work for M3-1,2,3,4 P/M & GBM
Oct 1995 - Apr 1996
67.Nippon Electric Glass (Malaysia) Sdn Bhd - NEG Phase V
Electrical System
Dec 1995 - Jun 1996
68.Canon Opto Factory KL Plan Shifting Project for Belt Conveyor and Optical Moulding
Electrical Works Supply of Labour, Material, Plant & Equipment
Jul 1997 - Oct 1997
69.Fuji Electric Factory Kulim High Tech Industrial Estate. Kedah
Electrical Services
Mar 1997 - Nov 1997
70.Sharp SEM & SRSSC Project Shah Alam
Electrical Works
Apr 1997 - Dec 1997
71.Rohm Wako Factory Extension Phase 4, Kelantan
Electrical Works
Mid Jul 1997 - Jan 1998
72.Toyokohan Factory, Kulim 2 storeys factory and utility buildings
Electrical Services
Dec 1997 - Jun 1998
73.Canon Phase 4 - Renovation
Electrical Services
Mar 1998 - Jun 1998
74.Toyo Memory Technology, Kulim Hi-Tech Park, Kedah
Electrical Services
Nov 1997 - Jun 1998
75.Nippon Electric Glass Phase VI
Electrical Work
Apr 1998 - Nov 1998
76.Nippon Electric Glass (M6-Tank)
Electrical Work
Mar 1999 - Jan 2000
77.Kenseisha (M) Sdn Bhd Bangi Industrial Estate
Electrical Work
Nov 1999 - May 2000
78.1st Silicon Wafer Fab Project, Kuching Sarawak
Supply, Installation, Testing, Commissioning for General Electric and Materials Non FAB
Nov 1999 - Jun 2000
79.Matsushita Electronics Corporation (M) Sdn Bhd Shah Alam (MMEC Ph III)
Electrical Works
Nov 1999 - Jun 2000
80.Nippon Electric Glass (M2-Tank) Shah Alam
Electrical Works
Nov 1999 - Jul 2000
81.NEG VII (M2-T)
Electrical Works
Nov 1999 - Aug 2000
82.Fujimi-Micro Technology Sdn Bhd
Electrical Works
Feb 2000 - Aug 2000
83.Sony Technology (M) Sdn Bhd
33Kv Sub-station
Apr 2000 - May 2001
84.Sony Technology (M) Sdn Bhd
Electrical Works (Renovation)
Apr 2000 - May 2001
85.Nippon Electric Glass M7-Tank Shah Alam
33Kv, 11Kv & 415V Electrical Works
Oct 2000 - Sept 2001
86.Sagami Manufacturer Sdn Bhd Renovation and Extension Works Batu Gajah, Perak
LV Electrical, Lightning Protection, P.A and Telephone System
Feb 2001 - Nov 2001
87.Addition and Alteration including upgrading of Fujikura Factory
Mechanical and Electrical
May 2002 - Dec 2002
88.Cast Leaf Facility Project for Philip Morris Malaysia
Electrical System works
Dec 2002 - July 2003
89.Matsushita Display Device Malaysia (MDDM) M5-B Line Upper Process Project
Electrical Works
Sep 2003 - Jan 2004
90.Canon Opto (M) Sdn Bhd
Electrical Works
Jan 2004 - Dec 2005
91.Nippon Electric Glass (M) Sdn Bhd
Electrical Works
Jan 2004 - Dec 2005
92.Spansion (Kuala Lumpur) Sdn Bhd
Electrical Works
Jan 2004 - Dec 2005
93.Rohm Wako Electronics (M) Sdn Bhd
Electrical Works
Nov 2004 - Nov 2005
94.Cadangan Kompleks Kilang Biodiesel diatas Plot C-3 (A/East, Lumut Port Industrial Park, Mukim Lumut, Lumut, Jalan Kg. Acheh, Daerah Manjung, 32000 Setiawan, Perak Darul Ridzuan
Turnkey Contract for the supplementary Work relating to and in Connection with the plant work for a 60,000 tpy Biodiesel Plant
June 2006 - Sept 2007
95.YKK (Malaysia) Factory Expansion Project
Electrical (HT & LT) Services
Sept 2006 - Dec 2007
96.Kota Bharu, Kelantan Darul Naim - Rohm Wako Phase 1 & Phase 2 Renovation Works
Electrical Services
Sept 2008 - Apr 2009
97.Nippon Electric Glass (M) Sdn Bhd Renovation Works
Electrical Services
Mar 2009 - Aug 2009
98.Upgrading of 11KV Incomer (TNB) at JVC Factory
Electrical Services
Aug 2009 - Dec 2009
99.Tasco Warehouse
JEM-Trans-Asia JEM-Warehouse Trans Asia Renovation work
Electrical Services
Sept 2009 - Feb 2010
100.PAVCKM warehouse - carpark
Electrical Services
Mar 2010 - June 2010
101.33KV & Part of Low Voltage Electrical Installation at Lot 51682 and Partly Lot 48625, Jalan Timah 1, Pasir Gudang Industrial Estate, 81700 Johor
Electrical Services
Aug 2009 - Sept 2010
102.PAVCJM - Machine Wiring
Electrical Works
June 2010 - Dec 2011
103.Nippon Electric Glass (M) Sdn Bhd 132KV Power Supply & M7 Tank Renovation
Electrical Works
Jun 2010 - May 2011
104.The Supply, Delivery, Installation, Testing and Commissioning of Temporary Power Supply Installation For Proposed Integrated Steel Complex at Kawasan Perindustrian Teluk Kalung, Mukim Teluk Kalung, 24000 Kemaman, Terengganu Darul Iman for M/S Eastern Steel Sdn Bhd
Temporary Electrical Power Supply
Feb 2012 - May 2012
105.The Construction and Completion of the Central Monitoring System Works for Panasonic Energy Malaysia Sdn Bhd - New Factory at Kulim, Kedah
Central Monitoring System
May 2012 - Dec 2013
106.Cadangan tambahan dan perubahan kepada kilang yang sediada di atas Lot H.S (D) 8147, P.T No. 4444, Lot 6343, seksyen 20, Bandar Serendah Majlis Daerah Hulu Selangor, Daerah Hulu Selangor, Selangor Darul Ehsan untuk Perodua Manufacturing Sdn Bhd
Electrical Services
May 2013 - May 2014
107.M Project, Pasir Gudang Industrial Estate, Pasir Gudang, Johor 11KV & LV System
Electrical Works
Feb 2013 - June 2014
108.Sagami-Project MO-1
Electrical & Intruments Cabling Works
Aug 2013 - May 2014
109.Upgrading of 6.6KV system to 11KV
Electrical Works
Feb 2014 - Aug 2014
110.NEG - Nippon Electric Glass 11KV & LV System
M3 Tank Fibre
Aug 2014 - Mar 2015
111.RohmWako
Secondary Wiring & Renovation
Sep 2014 - Mar 2015
112.NEG - Nippon Electric Glass
M3 Tank Fibre
Jun 2015 - Dec 2015
113.MOI HK Project
"Electrical Service & Instruments Cabling Works"
Jun 2015 - Dec 2015
NONAME OF PROJECTNATURE OF WORK
COMMENCEMENT AND COMPLETION
1.
SRC Expansion Project SingaporeElectrical Installation
Jan 1980 - Oct 1980
2.Kallang Gas Works Singapore
Electrical & Instrumentation Works
Jul 1981 - Nov 1981
3.Bulk Oil Storage Yard for Petronas Bay at Sabah Sepangar Bay
Electrical, Instrumentation, Fire Fighting, HVAC, etc.
Apr 1984 - Jul 1985
4.Hyundai Engineering & Construction Co. Ltd. Expansion of Gas Processing Plant and Export Terminal Expansion of the Peninsular Gas Utilization Project Stage II, System 2, Terengganu
Instrumentation Works
Jan 1989 - Dec 1990
5.ESSO Power Former Plant at Port Dickson
Electrical & Instrumentation & HVAC
Jun 1989 - Sep 1989
6.MLNG-SMDS Interconnections for the Bintulu Shell Middle Distilate Synthesis Project
Electrical / Instrumentation Works
Aug 1991 - Mar 1992
7.Petronas PGU Stage II & III Kerteh, Terengganu
Electrical & Instrumentation Works
Sep 1991 - Jun 1992
8.SMDS Bintulu Solidification Plant
Steel Structure, Equipment & Machinery Installation, Electrical Installation for Computer Room
Apr 1992 - Mar 1993
9.Mitsui Engineering & Shipbuilding Co. Ltd M3PS Pasir Gudang, Johor
Electrical Works
Jan 1993 - Jan 1994
10.MMDF Plant and Chip Plant, Miri, Sarawak
Electrical and Instrument Construction Work
Jan 1997 - Dec 1997
11.Peninsular Gas Utilisation Project Gas Processing Plants 5 & 6 Pipelines & Marine Terminal, Kerteh, Terengganu
Electrical Works (Up to 132KV System)
Oct1996 - Jun 1999
12.SMDS Reconstruction Project Bintulu, Sarawak
Electrical Works
May 1999 - Apr 2000
13.Propane Dehydrogenation Project Gebeng, Kuantan, Pahang
Electrical & Instrumentation Works
Jul 1999 - Sep 2001
14.SMDS Debottlenecking Project Bintulu, Sarawak (Upgrading)
Electrical Works
Dec 2002 - May 2003
15.Proposed New MLNG Annex Office Building
Building M & E M & E Relocation Work
Jun 2003 - Dec 2006
16.The Engineering, Procurement, Construction And Commissioning (EPCC) of upgrading TTLR and Associated Works at Melaka Fuel Terminal (PDB/SDD/46/2011/0217)
Loading Arms for ULG 95, ULG 97 and Bio Diesel
Nov 2011 - Jun 2013
17.Kertih Port Jetty Maintenance Services (Price Agreement)
Jetty Maintenance
Apr 2013 - Apr 2015
18.Engineering, Procurement, Construction and Commissioning (EPCC) of Main Engineering Office (MEO Project) at Petronas LNG Complex Bintulu, Sarawak
Electrical, Fire & Plumbing Services
Dec 2011 - July 2015
NONAME OF PROJECT
NATURE OF WORK
COMMENCEMENT AND COMPLETION
1.MAS Hangar / Workshop, Subang
Electrical, Ligtning Telephone and Public Address System
Jan 1984 - July 1985
2.MAS Hangar (03) Workshop Complex, Subang
Electrical Works
Mar 1992 - Nov 1993
3.K L International Airport Project Package 1 - Main Terminal Building, Contact Pier
Electrical HV, LV & GS Services
Oct 1995 - July 1997
4.MAS-KLIA Ground Support Facilities (Catering Complex), Sepang
Electrical HT & LV , Standby Generator & Telephone
Aug 1996 - Oct 1997
5.MAS Hangar 04, Sultan Abdul Aziz Shah Airport, Subang
Electrical Works
Nov 1996 - Aug 1997
6.K L International Airport Package UT-02, Sepang
Substation Equipment for Electrical Reticulation for 33KV & 11KV System
Nov 1995 - Dec 1997
7.New Tawau Airport, Sabah
Manufacture, Supply, Factory Test, Delivery, Installation and Testing & Commissioning of HV and External LV System
Jan 1998 - July 2001
NONAME OF PROJECT
NATURE OF WORK
COMMENCEMENT AND COMPLETION
1.PKNS Housing Scheme Bangi
Electrical, TV and System
Sep 1982 - Aug 1985
2.PKNS Housing Scheme Ampang, Kuala Lumpur Low & Medium Cost Highrise Flat
Electrical, Gen-Set & Telephone Services
Jan 1983 - Mid 1987
3.Mount Pleasure Apartments Penang
Electrical, MATV, Fireman and Apartment Intercom and Telephone Services
Feb 1985 - Feb 1987
4.OBD Garden Tower Condominium 260 units high cost apartments Taman Desa, Kuala Lumpur
Electrical, Air-conditioning, Ventilation and Pressurization Services
Jul 1991 - Apr 1993
5.Subang Jaya Condominium 3 blocks (15,18 & 20 storey) 150 units high cost apartments
a) Electrical Services
b) Fire Fighting Services
c) Cold Water, Plumbing
and Sanitary Services
d) Air-conditioning and
Ventilation Services
Aug 1991 - Dec 1993
6.Kiara Water Fall Condominium Bayu Angkasa, Kuala Lumpur 232 units high cost apartments
Electrical Services
Jul 1992 - 6/7/1994
7.Sentul Perdana Menara Okid - 720 units 20/23 storey medium cost apartment
a) Electrical Services
b) Fire Protection System
c) Lift Services
Jun 1995 - Sep 1997
8.Sentul Perdana Phase 1 ~ 3 Blocks of 4/5/6/7 Storey Condominium "Anjung Villa" and Club House at Sentul Perdana Bandar Baru Sentul, Kuala Lumpur
Mechanical & Electrical and Infrastructure Works
April 2001 - Sep 2002
9.Kiaramas Sutera Condominium Phase 1, 2 Blocks 28 Storey Condominium comprising of 325 units with recreation facilities and podium car park
Electrical Installation
Mar 2002 - May 2004
10.Sentul Perdana Phase 2B ~ 1 Block of 3 Storey Community Hall with Public and Recreation Facilities at Sentul Perdana Bandar Baru Sentul Kuala Lumpur
Design, construct and complete Building, Mechanical and Electrical & Infrastructure Works
Apr 2003 - Sept 2004 (Stage 1)
11.Taman Sri Rampai Housing and Community Facilities, Kuala Lumpur ~ Parcel I (1911 units)
Design, construct and complete Building, Mechanical & Electrical and Infrastructure Works
Jun 2003 - Feb 2005
12.2 Storey Bungalow c/w loft and swimming pool at Lot 4929,. Selekoh Tunku, Bukit Tunku, Kuala Lumpur
Construct and Complete Building, ID, Mechanical & Electrical and Infrastructure Works
Mar 2003 - July 2005
13.Sentul Perdana Phase 2A ~ 3 Blocks of 22/26 Storey Apartment "Pangsapuri Mawar" at Sentul Perdana, Bandar Baru Sentul, Kuala Lumpur
Design, construct and complete Building, Mechanical & Electrical and Infrastructure Works
Mar 2002 - Aug 2005
14.Sentul Perdana Phase 4 ~ 4 Block of 4-24 Storey Apartments "Pangsapuri Melur" c/w Car Parks and Public Facilities at Sentul Perdana Bandar Baru Sentul, Kuala Lumpur
Design, construct and complete Building, Mechanical & Electrical and Infrastructure Works
Apr 2004 - Aug 2006
15.Taman Sri Rampai Housing and Community Facilities, Kuala Lumpur ~ Parcel II (880 units)
Design, construct and complete Building, Mechanical & Electrical and Infrastructure Works
Apr 2004 - Jan 2007
NONAME OF PROJECT
NATURE OF WORK
COMMENCEMENT AND COMPLETION
1.Pan Pacific Hotel, Kuala Lumpur
LV Electrical Works and special lightings
Mar 1984 - Sep 1985
2.Samudra Office Complex and Holiday Inn City Centre Kuala Lumpur
HT, LV Electrical, Gen-set PA, Telephone, special lightings for rooms & function rooms
Apr 1984 - Nov 1985
3.Hyatt Hotel at Subang Golf Resort, Subang
HT, LV, Gen-set & Telephone Services, special lightings for rooms & function rooms
Jul 1985 - Jun 1987
4.Kuching Hilton Hotel for Pernas Hotel Chain
Plumbing Services
Mar 1987 - Dec 1988
5.Plaza Hotel, Bintulu (161 rooms)
a) A/C Ventilation
b) Plumbing Services
c) Sound & MATV Services
Nov 1988 - Apr 1989
6.Crown Prince Hotel, Penang 18 storey
Mechanical & Electrical Services
Jun 1990 - Jul 1992
7.Golden Valley Golf & Country Club, Clubhouse, Melaka
Mechanical & Electrical Works
Apr 1992 - Mar 1993
8.Riviera Bay Resort Condominium, Melaka
a) Eelectrical Services
b) Air Conditioning &
Ventilation System
May 1993 - Oct 1994
NONAME OF PROJECT
NATURE OF WORK
COMMENCEMENT AND COMPLETION
1.Sabah Medical Centre
High Tension, Low Tension, Nurse Call and Intercom System, Master Antenna TV & Public Address, PABX and Telephone & Fire Protection Services Services
Oct 1984 - Oct 1986
2.Electrical Works
YTL/Regency Medical Centre (Seri Alam)
Sep 2000 -Apr 2001
3.Hospital Kuala Penyu - Package KP4N1 Sabah, East Malaysia
Mechanical and Electrical Services
Aug 2002 - Mar 2005
4.Hospital Sarikei - Package SK4N1 Sarawak, East Malaysia
Mechanical and Electrical Services
Aug 2002 - June 2005
5.Hospital Kunak Package KU4N1 Sabah, East Malaysia
Mechanical and Electrical Services
Aug 2002 - June 2005
6.Assunta Hospital 7 storey Hospital Block & 7 storey Car Park
Extension & Renovation of Hospital New Building and Carpark
Dec 2002 - Dec 2007
NONAME OF PROJECT
NATURE OF WORK
COMMENCEMENT AND COMPLETION
1.Asean Poultry Disease Research & Training Centre, Ipoh
Electrical Works
Feb 1987 - Jan 1988
2.University Malaysia Sabah
Design, Supply, Delivery, Installation, Testing and Commissioning of Sewerage Treatment Plant System
Sep 1997 - Mar 1998
3.University Malaysia Sabah
66 KV Main Intake Sub-station Electrical Equipment Installation Works
Oct 1997 - Mar 1999
4.University Malaysia Sabah
11KV Equipment Installation, 11KV Cabling, Street Lighting and Telekom Manhole and Ducting
Nov 1997 - Jul 1999
5.University Malaysia Sabah - Phase 1B Institut Penyelidikan Marin
Electrical Services
July 2000 - 30 April 2001
6.Infrastructure and Computerization of 500 Secondary and Primary Schools in F.T and Perak
M & E Works
Feb 2001 - Sep 2001
7.Cadangan Membina dan Menyiapkan Sekolah Rendah (Fasa 2) dan Kerja-Kerja Berkaitan Dengannya di atas PT 1480, Presint 9, Wilayah Persekutuan Putrajaya
Project Management For :- Construct and complete Building, Mechanical & Electrical and Infrastructure Works
Jun 2002 - April 2004
8.Cadangan Merekabentuk, Membina, Melengkap, Menyiapkan, Mentauliah Dan Menyelenggarakan Kerja-Kerja Infrastructur Utama Dan Kerja-Kerja Satelit untuk Tambahan Kampus Universiti Technologi Mara di Lot PT. 1567 & 1568, Mukim Jeram, Daerah Kuala Selangor, Selangor Darul Ehsan
Electrical Services
Mar 2007 - Feb 2009
NONAME OF PROJECT
NATURE OF WORK
COMMENCEMENT AND COMPLETION
1.Pontoon Project No. 6
Supply, Repair/Renew & Install Equipment
Feb 1994 - Dec 1994
2.The Construction, completion and maintenance of the Port Operating Facilities for Pelabuhan Tanjung Pelepas
Mechanical and Electrical
Aug 1998 - Dec 2001
3.The Construction, Installation, Testing, Commissioning and Maintenance of Reefer Stacks and Associated M&E Works for Pelabuhan Tanjung Pelepas
Maintenance of Refer Stacks and Associated M&E Works
Sept 2000 - Dec 2001
4.Upgrading of M&E Installation at Substation No. 9 and other works associated with substation No. 8 for Pelabuhan Tanjung Pelepas
Mechanical and Electrical
Nov 2001 - Mar 2002
5.Testing, Commissioning and Maintenance of Reefer Stacks and Associated M&E Works for Pelabuhan Tanjung Pelepas
Maintenance of Refer Stacks and Associated M&E Works
Dec 2002 - May 2003
6.Cadangan Pembangunan Pelabuhan Tanjung Pelepas - Phase II The Construction, Completion & Maintenance of the Port Operating Facilities
Water Supply & Sewerage, Electrical Infrastructure, External Hydrant Systems, Utility Infrastructure, Building Works and Security
Sept 2004 - Aug 2005
NONAME OF PROJECT
NATURE OF WORK
COMMENCEMENT AND COMPLETION
A.Overhead Transmission / Underground
1.33KV Overhead Transmission Lines for Kuching & Sibu
Installation including Civil Works
Jan 1977 - Dec 1978
2.Supply and Install 33KV Overhead Conductors & Access at Bintulu
Electrical Works
Aug 1979 - Dec 1979
3.KTMB Double Tracking Electrification Project in Selangor Darul Ehsan
Supply, Installation and Commissioning of 132KV XLPE Underground Cables
Mar 2003 - Dec 2005
B.Power Station
1.Sungai Biawak Power Station
Lighting and Small Power Installation
Mar 1978 - Jul 1978
2.Paka Power Station (Phase II)
Low Tension, Air-conditioning and Plumbing Services
Dec 1983 - Apr 1985
3.3 x 700MW Coal-Fired Power Plant, Tanjung Bin, Johor
Mechanical and Electrical Works
Jan 2004 - Aug 2007
C.Steel Structure
1.The Construction, Installation, Testing, Commissioning and Maintenance of Reefer Stacks and Associated M&E Works
Maintenance of Reefer Stacks and Associated M&E Works
Dec 2002 - May 2003
2.Reefer Stacks and Associated Mechanical and Electrical Works
Maintenance of Reefer Stacks and Associated M&E Works
Oct 2000 - Dec 2000
3.SMDS Solidification Plant
Steel Structure, Equipment and Machinery Installation, Electrical Installation
Apr 1992 - Mar 1993
D.

Substation -11kV to 33kV Substation
1.NEG Phase III

33KV Power Supply, 11KV/3.3KV, 11KV/415V Sub-Station System and Generator Set Installation
Jun 1994 - Dec 1994
2.Matsushita Electronics Corp
33KV and 11KV Sub- Station Equipment and Cabling Works
Jul 1995 - Feb 1996
3.KLIA - UT-02
Substation Equipment for Electrical Reticulation for 33KV & 11KV System
Nov 1995 - Dec 1997
4.MAS-KLIA (Catering Complex)
Electrical HT & LV, Standby Generator & Telephone
Aug 1996 - Jan 1997
5.Fuji Electric Factory
Electircal Services 33KV, 11KV & 415V
Mar 1997 - Nov 1997
6.Sony Technology (M) Sdn Bhd
33KV Sub-station
Apr 2000 - May 2001
7.Nippon Electric Glass
33KV, 11KV & 415V Electrical Works
Oct 2000 - Sept 2001
8.Propane Dehydrogenation Project
Electrical & Instrumentation Works
Jul 1999 - Sept 2001
9.Proposed 33/11KV Main-Intake Substation and Upgrading of Existing 11KV Distribution System
Elecrical Services
Dec 2007 - Oct 2008
10.Kelang - Jajaran Sungai Buloh - Kajang Underground Works (Tunnels, Stations & Associated Structures) Between North Portal Semantan And Maluri South Portal
33KV Switchgear System
Jun 2012 - Apr 2013
66kV Substation
1.University Malaysia Sabah
66 KV Main Intake Sub-station Electrical Equipment Installation Works
Jan 1997 - Mar 1999
132kV Substation
1.Peninsular Gas Utilisation Project ~ Gas Processing Plants 5 & 6 Pipelines & Marine Terminal
Electrical Works (Up to 132KV System)
Oct 1996 - Jun 1999

230kV Substation
1.Engineering, Procurement and Construction for Siam Power Generation Public Company Ltd - 230Kv Switchyard, Baan Khai, Rayong Province
Electrical Services
Sept 2009 - Jan 2010
500kV Substation
1.2 X 700MW Coal Fired Independent Power Plant in Kuala Lukut, Mukim Jimah, District of Port Dickson, Negeri Sembilan Darul Khusus
Design, Construct and complete Extra High Voltage Electrical Work at Interconnection Facilities Switchyard
Jan 2006 - April 2008
NONAME OF PROJECT
NATURE OF WORK COMMENCEMENT AND COMPLETION
1.Design, Construction, Completion and Commissioning of Integrated Customs, Immigration and Quarantine Complex (CIQ-05) Johor Bahru, Johor
Mechanical Works
Sept 2003 - Dec 2008
2.Design, Construction, Completion and Commissioning of Integrated Customs, Immigration and Quarantine Complex (CIQ-06) Johor Bahru, Johor
Electrical Works
Sept 2003 - Dec 2008
NONAME OF PROJECTNATURE OF WORK
COMMENCEMENT AND COMPLETION
1.Remaining and Reinstatement works for partly completed 5-Star International Hotel at K-5, Hanoi
Building, ID, FFNB, all Mechanical & Electrical Works and External Works
Mar 2003 - Oct 2003
2.The Completion of the Intercontinental Westlake Hotel Nghi Tam Village, Hanoi, Vietnam
Turnkey contract for the rehabilitation, upgrade and completion of Architectural, ID, M&E & Landscape services
July 2005 - Dec 2007
NONAME OF PROJECT
NATURE OF WORK
COMMENCEMENT AND COMPLETION
1.Ayer Keroh-KL Expressway Toll Collection Station
Electrical InstallationJul 1986 - Mar 1987
2.Construction of KL Sewage Treatment Plant Project Phase 1 Package 1 : Sewer Networks
Pipe Jacking Works
Jan 2004 - Mar 2008
3.Temporary power supply for construction of IB Tower at Jalan Binjai, Kuala Lumpur
Electrical Services
Apr 2012 - Sept 2012
4.Proposed construction of a single-storey warehouse with a two-storey office block for Toyota Tsusho (M) Sdn Bhd on part of Lot PT216, Jalan Keluli 2 (KU05) Prime Bukit Raja Industrial Park, Klang Bandar Diraja, Selangor, Malaysia
Electrical Services
Aug 2012 - Mar 2013