NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | Dayabumi Complex Phase 3 Kuala Lumpur 38 storey Tower Block and 8 storey Podium Block 42 storey Ofice Block | a) Supply and Installation of Low Voltage System including Programmable Lighting Control, Telephone and Standby Gen-set b) Whole Fire Protection Service | Jan 1982 - Feb 1984 |
2. | PNB HQ Building 42 storey office block, Kuala Lumpur | High Tension, Low Tension, Standby Gen-set, Public Address, Telephone & Building Automation System Services | Jan 1982 - Apr 1984 |
3. | MUIS HQ Building, Kota Kinabalu, Sabah | a) Electrical Services High Tension, Low Voltage Standby Gen-set and Telephone Services b) Air-cond & Ventilation Services c) Fire Protection Services d) Lifts & Escalator Services e) Plumbing & Drainage Services | Dec 1982 - Jun 1986 |
4. | Sesco HQ Building, Kuching, Sarawak | Electrical, Telephone, Air-Conditioning and Ventilation,Fire Protection and Public Address System | Sep 1983 - Sep 1985 |
5. | Wisma Saberkas, Kuching, Sarawak | High Tension, Low Voltage & Telephone Services | Nov 1983 - Jul 1985 |
6. | Kompleks Karamunsing, Kota Kinabalu, Sabah | Low Tension Services | Feb 1984 - Jul 1985 |
7. | Multi-Storey Car Parking Building, Kuala Lumpur | High Tension, Low Tension, Standby Gen-set and Telephone Services | Mar 1984 - Aug 1984 |
8. | EPF Building, Sabah | High Tension, Low Tension & Gen-set | Mar 1984 - Jan 1986 |
9. | Wilayah Shopping Centre, Sabah | Electrical, Fire Protection, Plumbing, Telephone and Public Address System | Oct 1984 - Jan 1985 |
10. | Sabah Medical Centre | High Tension, Low Tension, Nurse Call and Intercom System, Master Antenna TV & Public Address, PABX and Telephone & Fire Protection Services | Oct 1984 - Oct 1986 |
11. | Bank Pembangunan Malaysia Berhad, Kuala Lumpur 30 storey 2 blocks Office Building | Electrical Services | Dec 1984 - Jul 1987 |
12. | TSI MED, Cantonment Road, Penang 8 storey 6 levels of Basement Carpark | M & E Works a) Electrical b) Air-conditioning c) Fire Fighting | Jan 1987 - Oct 1987 |
13. | Yaohan, Penang Kompleks Tunku Abdul Rahman | Renovation Works a) Air Conditioning and Mechanical Ventilation b) Fire Fighting Services c) Electrical, Public Adress & Telephone Installation d) Plumbing | Aug 1988 - Oct 1988 |
14. | UOB Plaza 1 Singapore 280 metre high c/w 66 storey & 3 basement intelligent Building | Electrical Installation Works | Jun 1990 - Jun 1992 |
15. | Yamaha Music School, Kelana Jaya | Mechanical & Electrical Services a) Electrical Installation b) Airconditioning & Mechanical Ventilation Installation c) Plumbing & Sanitary Installation | May 1992 - Mar 1993 |
16. | Sarawak Shell BerhadLutong, Sarawak 4 storey main office extension | Supply Installation, Testing and Commissioning of Electrical Installation for Computer Room | Mar 1992 - Jun 1993 |
17. | Petronas Carigali Sdn Bhd Baram Delta Operation (BDO), Miri, Sarawak | Electrical (Low Voltage) Services Installation | Dec 1992 - Jan 1994 |
18. | Sabah Shipyard North of Bay 3 Development | Mechanical Installation | Sep 1993 - Mar 1994 |
19. | MAC Technology Sdn Bhd, Senawang | Mechanical & Electrical Works | Nov 1993 - Mar 1994 |
20. | OUG Shopping Complex (Yaohan) Renovation & Extension to 4 storey carpark at the existing | Mechanical & Electrical Services a) Electrical Installation b) Air-conditioning Services c) Fire Fighting Services d) Plumbing Services | May 1994 - Aug 1994 |
21. | Labuan Financial Park including Auditorium | - Electrical Services including Decorative Fittings, Dimmers, PA & Audio System - Aircon, Ventilation & Acoustic System - Fire Fighting Services - Sanitary Plumbing & Cold Water Services | Dec 1993 - May 1995 |
22. | Likas View Sdn Bhd 16 storey Commercial cum Residential Development, Kota Kinabalu | a) Plumbing & Sanitary System b) Fire Protection System c) Electrical System | Jul 1994 - Sep 1995 |
23. | Menara Kuala Lumpur | Sanitary Plumbing | Jul 1993 - End 1995 |
24. | Kuala Lumpur City Centre (KLCC) Northwest Development Construction of the Petronas Twin Tower (Tower 2) | Electrical Works for Shell & Core | Jan 1994 - Jun 1996 |
25. | Suria KLCC Podium, Retail & Carpark Project | Electrical Services | Jan 1996 - Aug 1997 |
26. | Labuan Financial Park Block 4 | Airconditioning & Mechanical Ventilation System, Building Automation System, Fire Fighting & Detection System and Electrical Services | Mar 1996 - Sep 1997 |
27. | Malacca Raya 7-storey Shopping Complex | High Voltage, Low Voltage Electrical, Telephone Standby Generators, Public Address and Fireman Intercom System | Nov 1996 - Sep 1997 |
28. | Menara Landmark Johor Bahru | Air Conditioning Mechanical Ventilation | Jan 1996 - End 1997 |
29. | Petronas Tower Link/ Philharmonic Hall - Petronas Art Gallery | Electrical Services and Audio Visual Services | Nov 1997 - Mar 1998 |
30. | Philharmonic Concert Hall at KLCC Tower | - Electrical Services including Decorative Fittings, Dimmers, PA & Audio System - Aircon, Ventilation & Acoustic System - Fire Fighting Services - Sanitary Plumbing & Cold Water Services | Feb 1997 - Jul 1998 |
31. | KLCC Tower 2 Skylobby Malaysian Petroleum Club (MPC) | M&E Services - Airconditioning Services, - Fire Protection Services & - Electrical Services | Aug 1998 - Jul 1998 |
32. | Malaysian Petroleum Club (MPC) Petronas Tower 2 | Mechanical & Electrical Services | Nov 1997 - Oct 1998 |
33. | Mitsubishi Corporation Office | Electrical Work | Aug 1998 - Dec 1998 |
34. | NTT MSC Internet Data Centre Building at Cyberjaya Flagship Zone | Electrical Services | Mar 2001 - Sep 2001 |
35. | Menara Great Eastern Life | Design & Installation, Testing and Commissioning of Electrical Services, Car Park Access System, Sound System and Security System | Jun 1999 - Nov 2001 |
36. | Pusat Khidmat Budi Penyayang Malaysia Kepala Batas, Pulau Pinang | Construct and complete Building, Mechanical & Electrical and Infrastructure Works | Aug 2003 - May 2004 |
37. | Proposed Supply, Delivery, Installation, Testing and Commissioning of Electrical and Mechanical Services for Retails Electrical, Load System in Suria KLCC, Mechanical Services for Retails Electrical Load System in Suria KLCC, Kuala Lumpur | Electrical and Mechanical | Nov 2003 - Jul 2004 |
38. | Proposed Design, Installation and Commissioning of Electrical Services for Isetan at Mid Valley City Phase II Bandaraya Kuala Lumpur | Elecrical Services | Mar 2007 - Sep 2007 |
39. | The Construction and Completion of the Superstructure Main Contract Works for the Proposed Mixed Development on Lot 171 (Lot C) at Persiaran KLCC, Kuala Lumpur City Centre, Kuala Lumpur | Electrical Services | Feb 2009 - Dec 2013 |
Completed Projects
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | ANC 2 storey Sungai Way, Selangor | Electrical, Air-Cond, Piping PA and Fire Services | Dec 1981 - Jun 1982 |
2. | SGS-ATES (M) Sdn Bhd | Electrical Installation | Aug 1984 - May 1985 |
3. | National Car, Proton Saga Plant / Factory, Shah Alam | HT System including Sub-Stationsm, LV, Telephone and PA System | Jan 1984 - May 1985 |
4. | Sony Electronics (M) Sdn Bhd Seberang Prai, Penang | Electrical and Telephone Services | Sep 1987 - Feb 1988 |
5. | Fujitsu Component (M) Sdn Bhd Batu Pahat, Johor | Electrical Services | Aug 1986 - Mid Jan 1989 |
6. | Sony Bangi Phase II Bangi, Selangor | LT Electrical Installation, Telephone, PA System, MATV and Security Services | Sep 1988 - Jun 1989 |
7. | Hitachi Electronic Products Malaysia Bangi, Selangor | Electrical Services | Jun 1989 - Mar 1990 |
8. | Evergreen Heavy Industrial Pasir Gudang, Johor One Block Container Factory, One Block 2 storey Office and One Block 2 storey Canteen | Electrical Services | Oct 1989 - Mar 1990 |
9. | Nitto Denko Shah Alam, Selangor | Electrical Services | Jul 1989 - Jun 1990 |
10. | Kobe Copper (M) Sdn Bhd Shah Alam, Selangor | Electrical and Telephone Services | Feb 1990 - Jun 1990 |
11. | Sony MVP Electronic Bangi, Selangor | Electrical Services | Jan 1990 - Jul 1990 |
12. | Rohm Wako (Kelantan) Phase II Kota Bahru | a) Electrical b) Air-cond, mechanical and Utilities Services | Feb 1990 - Jul 1990 |
13. | Matsushita Precision Capacitor Sdn Bhd Melaka | Electrical Services | Jul 1990 - Oct 1990 |
14. | Proton Saga Engine Factory Shah Alam, Selangor | Electrical Services | Jul 1990 - Nov 1990 |
15. | Top Thermo Manufacturing (M) Sdn Bhd Klang, Selangor | Electrical Services | Aug 1990 - Dec 1990 |
16. | TDK (M) Sdn Bhd Phase II Nilai, Negeri Sembilan | Electrical Services | Aug 1990 - Dec 1990 |
17. | JVC Phase II Shah Alam | Electrical Services | Aug 1990 - Mid Jan 1991 |
18. | Gunung Printing Ink Factory Shah Alam | Electrical Services | Sep 1990 - Jan 1991 |
19. | Canon Opto (M) Sdn Bhd Phase II Shah Alam, Selangor | Electrical Services | Aug 1990 - Feb 1991 |
20. | Tamura Electronics (T) Sdn Bhd Kemaman, Terengganu | a) Electrical b) Air-conditioning and Ventilation Services, Cold Water & Sanitary Plumbing and Fire Fighting work | Oct 1990 - Mar 1991 |
21. | JVC Manufacturing Malaysia Shah Alam, Selangor Phase 1 - Extension & Renovation | Electrical Services | Nov 1990 - 10 Apr 1991 |
22. | Canon Camera Malaysia Phase 1 Shah Alam, Selangor | Electrical Services | Mar 1991 - Aug 1991 |
23. | TDK Factory, Phase IV Nilai, Negeri Sembilan | Electrical Works | Mar 1991 - Oct 1991 |
24. | Matsushita Sports Stadium, Shah Alam, Selangor | Electrical Services HV, LV, Lighting & Power, Floodlighting System, PA System, etc. | Dec 1990 - Oct 1991 |
25. | Matsushita Television Co. (M) Sdn Bhd MTV Phase III Shah Alam, Selangor | Electrical Works | Apr 1991 - Nov 1991 |
26. | JVC Electronics Malaysia Sdn Bhd Shah Alam, Selangor | Electrical Works | May 1991 - Nov 1991 |
27. | Nichia (M) Sdn Bhd Shah Alam, Selangor | Mechanical & Electrical Services | Jun 1991 - Nov 1991 |
28. | Matsushita Electronics Corporation (M) Sdn Bhd | Electrical Works | May 1991 - Dec 1991 |
29. | Rohm Wako (K) - Phase III Pengkalan Chepa, Kelantan | Electrical, Air-conditioning & Mechanical Ventilation Services, Cold Water & Sanitary Plumbing Utility Services | Aug 1991 - Dec 1991 |
30. | Shinko Electronics (M) Sdn Bhd Shah Alam, Selangor | Electrical and Telephone Services | Sep 1991 - Dec 1991 |
31. | Nippon Electric, Shah Alam | Electric & Mechanical Services | Oct 1991 - Mar 1992 |
32. | Sumitomo Bakelite Malaysia (SNC Project), Pasir Gudang | Electrical Services | Jun 1991 - Apr 1992 |
33. | Sony Video Factory Phase II, Bangi | Electrical Works & Gen-set | Aug 1991 - Apr 1992 |
34. | Chugoku Marine Paint Pasir Gudang | Electrical Services | Jan 1992 - Jun 1992 |
35. | Nankai Worsted Spinning (M) Sdn Bhd - Phase II (NSM), Semenyih | Mechanical & Electrical Services | Feb 1992 - Jun 1992 |
36. | Matsushita Audio Video Pasir Gudang | Electrical Services | Jun 1991 - Jun 1992 |
37. | Nippon Electric Glass, Shah Alam | Electrical Works | Dec 1991 - Jul 1992 |
38. | PJVM Factory (Phase 3) Shah Alam | Electrical Services | Jan 1992 - Jul 1992 |
39. | ALPS Precision (M) Sdn Bhd, Nilai | Electrical Services | Jun 1992 - Mar 1993 |
40. | ALPS Electric (M) Sdn Bhd, Nilai | Electrical Works | Sep 1992 - Mar 1993 |
41. | Pioneer Technology (M) Sdn Bhd, Muar, Johor | Electrical Works | Sep 1992 - Aug 1993 |
42. | SGS-Thomson Microelectronics Sdn Bhd, Johor | a) Electrical Services b) Fire Protection | Mar 1993 - Dec 1993 |
43. | Fujikura (Malaysia) Sdn Bhd Subang Hi-Tech , Shah Alam | Electrical & Air-conditioning Services | Aug 1993 - Jan 1994 |
44. | Tylon Phase III Shah Alam | Electrical Installation | Nov 1993 - Mar 1994 |
45. | ALPS Precision (M) Sdn Bhd Phase II Jengka, Pahang | Electrical Installation | Nov 1993 - Apr 1994 |
46. | Hitachi (HELM) Phase 4 - Step 1 Project Johor | Mechanical & Electrical Services | Nov 1993 - Apr 1994 |
47. | Furukawa Factory, Klang MK Project | Electrical Work Plumbing & Fire Protection Air-conditioning & Ventilation | Oct 1993 - May 1994 |
48. | Texas Instruments Factory & Car Park Hulu Kelang | a) 33KV Sub-station b) 11KV Distribution System | End Jan 1994 - Aug 1994 |
49. | JVC Electronics (M) Sdn Bhd Parts Factory Complex, Phase II, Shah Alam | Electrical Works | Apr 1994 -Oct 1994 |
50. | Canon Shifting & Renovation Work, Shah Alam | Electrical Works | Sep 1994 - Oct 1994 |
51. | Nankai Worsted Spinning (Terengganu) Sdn Bhd | Mechanical & Electrical Services | Jun 1994 - Nov 1994 |
52. | NEG Phase II Shah Alam | Electrical Works | Jun 1994 - Dec 1994 |
53. | NEG Phase III Shah Alam | 33kv power supply, 11kv/3.3kv, 11kv/415v sub-station system and generator set installation | Jun 1994 - Dec 1994 |
54. | NEG Phase III Shah Alam | Electrical Works | Sep 1994 - Dec 1994 |
55. | JB District Park Sdn Bhd Warehouse & Office Phase II | Electrical Services | Aug 1994 - Jan 1995 |
56. | Fujitsu Factory Extension Phase II, Shah Alam | Electrical Services | Nov 1994 - Apr 1995 |
57. | Matsushita Audio Video Phase II, Shah Alam | Electrical Services | Feb 1995 - Jun 1995 |
58. | Nankai Worsted Spinning (Terengganu) Sdn Bhd | Mechanical & Electrical Services | Jun 1995 - Sep 1995 |
59. | SNC Industrial Laminates Sdn Bhd, Johor - Phase II | Electrical Services | Mar 1995 - Oct 1995 |
60. | Sumitomo Bakelite Factory Phase II, Shah Alam | Electrical Services | Mar 1995 - Oct 1995 |
61. | Matsushita Television CO. (M) Sdn Bhd, Shah Alam Phase III | Electrical Services | May 1995 - Oct 1995 |
62. | Nippon Electric Glass (M) Sdn Bhd, Shah Alam Phase IV | Electrical Services | May 1995 - Nov 1995 |
63. | Trio-Kenwood Electronics Engineering Sdn Bhd, Pasir Gudang, Johor | Electrical Services | Jun 1995 - Jan 1996 |
64. | Matsushita Audio Video (M) Sdn Bhd - Phase III Pasir Gudang, Johor | Electrical Services | Sep 1995 - Jan 1996 |
65. | Matsushita Electronics Corporation (M) Sdn Bhd, Shah Alam | Electrical Services | Jul 1995 - Feb 1996 |
66. | Nippon Electric Glass (M) Project - Phase IV (CRT Glass Bulb Factory) | Electrical Work for M3-1,2,3,4 P/M & GBM | Oct 1995 - Apr 1996 |
67. | Nippon Electric Glass (Malaysia) Sdn Bhd - NEG Phase V | Electrical System | Dec 1995 - Jun 1996 |
68. | Canon Opto Factory KL Plan Shifting Project for Belt Conveyor and Optical Moulding | Electrical Works Supply of Labour, Material, Plant & Equipment | Jul 1997 - Oct 1997 |
69. | Fuji Electric Factory Kulim High Tech Industrial Estate. Kedah | Electrical Services | Mar 1997 - Nov 1997 |
70. | Sharp SEM & SRSSC Project Shah Alam | Electrical Works | Apr 1997 - Dec 1997 |
71. | Rohm Wako Factory Extension Phase 4, Kelantan | Electrical Works | Mid Jul 1997 - Jan 1998 |
72. | Toyokohan Factory, Kulim 2 storeys factory and utility buildings | Electrical Services | Dec 1997 - Jun 1998 |
73. | Canon Phase 4 - Renovation | Electrical Services | Mar 1998 - Jun 1998 |
74. | Toyo Memory Technology, Kulim Hi-Tech Park, Kedah | Electrical Services | Nov 1997 - Jun 1998 |
75. | Nippon Electric Glass Phase VI | Electrical Work | Apr 1998 - Nov 1998 |
76. | Nippon Electric Glass (M6-Tank) | Electrical Work | Mar 1999 - Jan 2000 |
77. | Kenseisha (M) Sdn Bhd Bangi Industrial Estate | Electrical Work | Nov 1999 - May 2000 |
78. | 1st Silicon Wafer Fab Project, Kuching Sarawak | Supply, Installation, Testing, Commissioning for General Electric and Materials Non FAB | Nov 1999 - Jun 2000 |
79. | Matsushita Electronics Corporation (M) Sdn Bhd Shah Alam (MMEC Ph III) | Electrical Works | Nov 1999 - Jun 2000 |
80. | Nippon Electric Glass (M2-Tank) Shah Alam | Electrical Works | Nov 1999 - Jul 2000 |
81. | NEG VII (M2-T) | Electrical Works | Nov 1999 - Aug 2000 |
82. | Fujimi-Micro Technology Sdn Bhd | Electrical Works | Feb 2000 - Aug 2000 |
83. | Sony Technology (M) Sdn Bhd | 33Kv Sub-station | Apr 2000 - May 2001 |
84. | Sony Technology (M) Sdn Bhd | Electrical Works (Renovation) | Apr 2000 - May 2001 |
85. | Nippon Electric Glass M7-Tank Shah Alam | 33Kv, 11Kv & 415V Electrical Works | Oct 2000 - Sept 2001 |
86. | Sagami Manufacturer Sdn Bhd Renovation and Extension Works Batu Gajah, Perak | LV Electrical, Lightning Protection, P.A and Telephone System | Feb 2001 - Nov 2001 |
87. | Addition and Alteration including upgrading of Fujikura Factory | Mechanical and Electrical | May 2002 - Dec 2002 |
88. | Cast Leaf Facility Project for Philip Morris Malaysia | Electrical System works | Dec 2002 - July 2003 |
89. | Matsushita Display Device Malaysia (MDDM) M5-B Line Upper Process Project | Electrical Works | Sep 2003 - Jan 2004 |
90. | Canon Opto (M) Sdn Bhd | Electrical Works | Jan 2004 - Dec 2005 |
91. | Nippon Electric Glass (M) Sdn Bhd | Electrical Works | Jan 2004 - Dec 2005 |
92. | Spansion (Kuala Lumpur) Sdn Bhd | Electrical Works | Jan 2004 - Dec 2005 |
93. | Rohm Wako Electronics (M) Sdn Bhd | Electrical Works | Nov 2004 - Nov 2005 |
94. | Cadangan Kompleks Kilang Biodiesel diatas Plot C-3 (A/East, Lumut Port Industrial Park, Mukim Lumut, Lumut, Jalan Kg. Acheh, Daerah Manjung, 32000 Setiawan, Perak Darul Ridzuan | Turnkey Contract for the supplementary Work relating to and in Connection with the plant work for a 60,000 tpy Biodiesel Plant | June 2006 - Sept 2007 |
95. | YKK (Malaysia) Factory Expansion Project | Electrical (HT & LT) Services | Sept 2006 - Dec 2007 |
96. | Kota Bharu, Kelantan Darul Naim - Rohm Wako Phase 1 & Phase 2 Renovation Works | Electrical Services | Sept 2008 - Apr 2009 |
97. | Nippon Electric Glass (M) Sdn Bhd Renovation Works | Electrical Services | Mar 2009 - Aug 2009 |
98. | Upgrading of 11KV Incomer (TNB) at JVC Factory | Electrical Services | Aug 2009 - Dec 2009 |
99. | Tasco Warehouse JEM-Trans-Asia JEM-Warehouse Trans Asia Renovation work | Electrical Services | Sept 2009 - Feb 2010 |
100. | PAVCKM warehouse - carpark | Electrical Services | Mar 2010 - June 2010 |
101. | 33KV & Part of Low Voltage Electrical Installation at Lot 51682 and Partly Lot 48625, Jalan Timah 1, Pasir Gudang Industrial Estate, 81700 Johor | Electrical Services | Aug 2009 - Sept 2010 |
102. | PAVCJM - Machine Wiring | Electrical Works | June 2010 - Dec 2011 |
103. | Nippon Electric Glass (M) Sdn Bhd 132KV Power Supply & M7 Tank Renovation | Electrical Works | Jun 2010 - May 2011 |
104. | The Supply, Delivery, Installation, Testing and Commissioning of Temporary Power Supply Installation For Proposed Integrated Steel Complex at Kawasan Perindustrian Teluk Kalung, Mukim Teluk Kalung, 24000 Kemaman, Terengganu Darul Iman for M/S Eastern Steel Sdn Bhd | Temporary Electrical Power Supply | Feb 2012 - May 2012 |
105. | The Construction and Completion of the Central Monitoring System Works for Panasonic Energy Malaysia Sdn Bhd - New Factory at Kulim, Kedah | Central Monitoring System | May 2012 - Dec 2013 |
106. | Cadangan tambahan dan perubahan kepada kilang yang sediada di atas Lot H.S (D) 8147, P.T No. 4444, Lot 6343, seksyen 20, Bandar Serendah Majlis Daerah Hulu Selangor, Daerah Hulu Selangor, Selangor Darul Ehsan untuk Perodua Manufacturing Sdn Bhd | Electrical Services | May 2013 - May 2014 |
107. | M Project, Pasir Gudang Industrial Estate, Pasir Gudang, Johor 11KV & LV System | Electrical Works | Feb 2013 - June 2014 |
108. | Sagami-Project MO-1 | Electrical & Intruments Cabling Works | Aug 2013 - May 2014 |
109. | Upgrading of 6.6KV system to 11KV | Electrical Works | Feb 2014 - Aug 2014 |
110. | NEG - Nippon Electric Glass 11KV & LV System | M3 Tank Fibre | Aug 2014 - Mar 2015 |
111. | RohmWako | Secondary Wiring & Renovation | Sep 2014 - Mar 2015 |
112. | NEG - Nippon Electric Glass | M3 Tank Fibre | Jun 2015 - Dec 2015 |
113. | MOI HK Project | "Electrical Service & Instruments Cabling Works" | Jun 2015 - Dec 2015 |
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | SRC Expansion Project Singapore | Electrical Installation | Jan 1980 - Oct 1980 |
2. | Kallang Gas Works Singapore | Electrical & Instrumentation Works | Jul 1981 - Nov 1981 |
3. | Bulk Oil Storage Yard for Petronas Bay at Sabah Sepangar Bay | Electrical, Instrumentation, Fire Fighting, HVAC, etc. | Apr 1984 - Jul 1985 |
4. | Hyundai Engineering & Construction Co. Ltd. Expansion of Gas Processing Plant and Export Terminal Expansion of the Peninsular Gas Utilization Project Stage II, System 2, Terengganu | Instrumentation Works | Jan 1989 - Dec 1990 |
5. | ESSO Power Former Plant at Port Dickson | Electrical & Instrumentation & HVAC | Jun 1989 - Sep 1989 |
6. | MLNG-SMDS Interconnections for the Bintulu Shell Middle Distilate Synthesis Project | Electrical / Instrumentation Works | Aug 1991 - Mar 1992 |
7. | Petronas PGU Stage II & III Kerteh, Terengganu | Electrical & Instrumentation Works | Sep 1991 - Jun 1992 |
8. | SMDS Bintulu Solidification Plant | Steel Structure, Equipment & Machinery Installation, Electrical Installation for Computer Room | Apr 1992 - Mar 1993 |
9. | Mitsui Engineering & Shipbuilding Co. Ltd M3PS Pasir Gudang, Johor | Electrical Works | Jan 1993 - Jan 1994 |
10. | MMDF Plant and Chip Plant, Miri, Sarawak | Electrical and Instrument Construction Work | Jan 1997 - Dec 1997 |
11. | Peninsular Gas Utilisation Project Gas Processing Plants 5 & 6 Pipelines & Marine Terminal, Kerteh, Terengganu | Electrical Works (Up to 132KV System) | Oct1996 - Jun 1999 |
12. | SMDS Reconstruction Project Bintulu, Sarawak | Electrical Works | May 1999 - Apr 2000 |
13. | Propane Dehydrogenation Project Gebeng, Kuantan, Pahang | Electrical & Instrumentation Works | Jul 1999 - Sep 2001 |
14. | SMDS Debottlenecking Project Bintulu, Sarawak (Upgrading) | Electrical Works | Dec 2002 - May 2003 |
15. | Proposed New MLNG Annex Office Building | Building M & E M & E Relocation Work | Jun 2003 - Dec 2006 |
16. | The Engineering, Procurement, Construction And Commissioning (EPCC) of upgrading TTLR and Associated Works at Melaka Fuel Terminal (PDB/SDD/46/2011/0217) | Loading Arms for ULG 95, ULG 97 and Bio Diesel | Nov 2011 - Jun 2013 |
17. | Kertih Port Jetty Maintenance Services (Price Agreement) | Jetty Maintenance | Apr 2013 - Apr 2015 |
18. | Engineering, Procurement, Construction and Commissioning (EPCC) of Main Engineering Office (MEO Project) at Petronas LNG Complex Bintulu, Sarawak | Electrical, Fire & Plumbing Services | Dec 2011 - July 2015 |
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | MAS Hangar / Workshop, Subang | Electrical, Ligtning Telephone and Public Address System | Jan 1984 - July 1985 |
2. | MAS Hangar (03) Workshop Complex, Subang | Electrical Works | Mar 1992 - Nov 1993 |
3. | K L International Airport Project Package 1 - Main Terminal Building, Contact Pier | Electrical HV, LV & GS Services | Oct 1995 - July 1997 |
4. | MAS-KLIA Ground Support Facilities (Catering Complex), Sepang | Electrical HT & LV , Standby Generator & Telephone | Aug 1996 - Oct 1997 |
5. | MAS Hangar 04, Sultan Abdul Aziz Shah Airport, Subang | Electrical Works | Nov 1996 - Aug 1997 |
6. | K L International Airport Package UT-02, Sepang | Substation Equipment for Electrical Reticulation for 33KV & 11KV System | Nov 1995 - Dec 1997 |
7. | New Tawau Airport, Sabah | Manufacture, Supply, Factory Test, Delivery, Installation and Testing & Commissioning of HV and External LV System | Jan 1998 - July 2001 |
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | PKNS Housing Scheme Bangi | Electrical, TV and System | Sep 1982 - Aug 1985 |
2. | PKNS Housing Scheme Ampang, Kuala Lumpur Low & Medium Cost Highrise Flat | Electrical, Gen-Set & Telephone Services | Jan 1983 - Mid 1987 |
3. | Mount Pleasure Apartments Penang | Electrical, MATV, Fireman and Apartment Intercom and Telephone Services | Feb 1985 - Feb 1987 |
4. | OBD Garden Tower Condominium 260 units high cost apartments Taman Desa, Kuala Lumpur | Electrical, Air-conditioning, Ventilation and Pressurization Services | Jul 1991 - Apr 1993 |
5. | Subang Jaya Condominium 3 blocks (15,18 & 20 storey) 150 units high cost apartments | a) Electrical Services b) Fire Fighting Services c) Cold Water, Plumbing and Sanitary Services d) Air-conditioning and Ventilation Services | Aug 1991 - Dec 1993 |
6. | Kiara Water Fall Condominium Bayu Angkasa, Kuala Lumpur 232 units high cost apartments | Electrical Services | Jul 1992 - 6/7/1994 |
7. | Sentul Perdana Menara Okid - 720 units 20/23 storey medium cost apartment | a) Electrical Services b) Fire Protection System c) Lift Services | Jun 1995 - Sep 1997 |
8. | Sentul Perdana Phase 1 ~ 3 Blocks of 4/5/6/7 Storey Condominium "Anjung Villa" and Club House at Sentul Perdana Bandar Baru Sentul, Kuala Lumpur | Mechanical & Electrical and Infrastructure Works | April 2001 - Sep 2002 |
9. | Kiaramas Sutera Condominium Phase 1, 2 Blocks 28 Storey Condominium comprising of 325 units with recreation facilities and podium car park | Electrical Installation | Mar 2002 - May 2004 |
10. | Sentul Perdana Phase 2B ~ 1 Block of 3 Storey Community Hall with Public and Recreation Facilities at Sentul Perdana Bandar Baru Sentul Kuala Lumpur | Design, construct and complete Building, Mechanical and Electrical & Infrastructure Works | Apr 2003 - Sept 2004 (Stage 1) |
11. | Taman Sri Rampai Housing and Community Facilities, Kuala Lumpur ~ Parcel I (1911 units) | Design, construct and complete Building, Mechanical & Electrical and Infrastructure Works | Jun 2003 - Feb 2005 |
12. | 2 Storey Bungalow c/w loft and swimming pool at Lot 4929,. Selekoh Tunku, Bukit Tunku, Kuala Lumpur | Construct and Complete Building, ID, Mechanical & Electrical and Infrastructure Works | Mar 2003 - July 2005 |
13. | Sentul Perdana Phase 2A ~ 3 Blocks of 22/26 Storey Apartment "Pangsapuri Mawar" at Sentul Perdana, Bandar Baru Sentul, Kuala Lumpur | Design, construct and complete Building, Mechanical & Electrical and Infrastructure Works | Mar 2002 - Aug 2005 |
14. | Sentul Perdana Phase 4 ~ 4 Block of 4-24 Storey Apartments "Pangsapuri Melur" c/w Car Parks and Public Facilities at Sentul Perdana Bandar Baru Sentul, Kuala Lumpur | Design, construct and complete Building, Mechanical & Electrical and Infrastructure Works | Apr 2004 - Aug 2006 |
15. | Taman Sri Rampai Housing and Community Facilities, Kuala Lumpur ~ Parcel II (880 units) | Design, construct and complete Building, Mechanical & Electrical and Infrastructure Works | Apr 2004 - Jan 2007 |
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | Pan Pacific Hotel, Kuala Lumpur | LV Electrical Works and special lightings | Mar 1984 - Sep 1985 |
2. | Samudra Office Complex and Holiday Inn City Centre Kuala Lumpur | HT, LV Electrical, Gen-set PA, Telephone, special lightings for rooms & function rooms | Apr 1984 - Nov 1985 |
3. | Hyatt Hotel at Subang Golf Resort, Subang | HT, LV, Gen-set & Telephone Services, special lightings for rooms & function rooms | Jul 1985 - Jun 1987 |
4. | Kuching Hilton Hotel for Pernas Hotel Chain | Plumbing Services | Mar 1987 - Dec 1988 |
5. | Plaza Hotel, Bintulu (161 rooms) | a) A/C Ventilation b) Plumbing Services c) Sound & MATV Services | Nov 1988 - Apr 1989 |
6. | Crown Prince Hotel, Penang 18 storey | Mechanical & Electrical Services | Jun 1990 - Jul 1992 |
7. | Golden Valley Golf & Country Club, Clubhouse, Melaka | Mechanical & Electrical Works | Apr 1992 - Mar 1993 |
8. | Riviera Bay Resort Condominium, Melaka | a) Eelectrical Services b) Air Conditioning & Ventilation System | May 1993 - Oct 1994 |
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | Sabah Medical Centre | High Tension, Low Tension, Nurse Call and Intercom System, Master Antenna TV & Public Address, PABX and Telephone & Fire Protection Services Services | Oct 1984 - Oct 1986 |
2. | Electrical Works | YTL/Regency Medical Centre (Seri Alam) | Sep 2000 -Apr 2001 |
3. | Hospital Kuala Penyu - Package KP4N1 Sabah, East Malaysia | Mechanical and Electrical Services | Aug 2002 - Mar 2005 |
4. | Hospital Sarikei - Package SK4N1 Sarawak, East Malaysia | Mechanical and Electrical Services | Aug 2002 - June 2005 |
5. | Hospital Kunak Package KU4N1 Sabah, East Malaysia | Mechanical and Electrical Services | Aug 2002 - June 2005 |
6. | Assunta Hospital 7 storey Hospital Block & 7 storey Car Park | Extension & Renovation of Hospital New Building and Carpark | Dec 2002 - Dec 2007 |
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | Asean Poultry Disease Research & Training Centre, Ipoh | Electrical Works | Feb 1987 - Jan 1988 |
2. | University Malaysia Sabah | Design, Supply, Delivery, Installation, Testing and Commissioning of Sewerage Treatment Plant System | Sep 1997 - Mar 1998 |
3. | University Malaysia Sabah | 66 KV Main Intake Sub-station Electrical Equipment Installation Works | Oct 1997 - Mar 1999 |
4. | University Malaysia Sabah | 11KV Equipment Installation, 11KV Cabling, Street Lighting and Telekom Manhole and Ducting | Nov 1997 - Jul 1999 |
5. | University Malaysia Sabah - Phase 1B Institut Penyelidikan Marin | Electrical Services | July 2000 - 30 April 2001 |
6. | Infrastructure and Computerization of 500 Secondary and Primary Schools in F.T and Perak | M & E Works | Feb 2001 - Sep 2001 |
7. | Cadangan Membina dan Menyiapkan Sekolah Rendah (Fasa 2) dan Kerja-Kerja Berkaitan Dengannya di atas PT 1480, Presint 9, Wilayah Persekutuan Putrajaya | Project Management For :- Construct and complete Building, Mechanical & Electrical and Infrastructure Works | Jun 2002 - April 2004 |
8. | Cadangan Merekabentuk, Membina, Melengkap, Menyiapkan, Mentauliah Dan Menyelenggarakan Kerja-Kerja Infrastructur Utama Dan Kerja-Kerja Satelit untuk Tambahan Kampus Universiti Technologi Mara di Lot PT. 1567 & 1568, Mukim Jeram, Daerah Kuala Selangor, Selangor Darul Ehsan | Electrical Services | Mar 2007 - Feb 2009 |
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | Pontoon Project No. 6 | Supply, Repair/Renew & Install Equipment | Feb 1994 - Dec 1994 |
2. | The Construction, completion and maintenance of the Port Operating Facilities for Pelabuhan Tanjung Pelepas | Mechanical and Electrical | Aug 1998 - Dec 2001 |
3. | The Construction, Installation, Testing, Commissioning and Maintenance of Reefer Stacks and Associated M&E Works for Pelabuhan Tanjung Pelepas | Maintenance of Refer Stacks and Associated M&E Works | Sept 2000 - Dec 2001 |
4. | Upgrading of M&E Installation at Substation No. 9 and other works associated with substation No. 8 for Pelabuhan Tanjung Pelepas | Mechanical and Electrical | Nov 2001 - Mar 2002 |
5. | Testing, Commissioning and Maintenance of Reefer Stacks and Associated M&E Works for Pelabuhan Tanjung Pelepas | Maintenance of Refer Stacks and Associated M&E Works | Dec 2002 - May 2003 |
6. | Cadangan Pembangunan Pelabuhan Tanjung Pelepas - Phase II The Construction, Completion & Maintenance of the Port Operating Facilities | Water Supply & Sewerage, Electrical Infrastructure, External Hydrant Systems, Utility Infrastructure, Building Works and Security | Sept 2004 - Aug 2005 |
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
A. | Overhead Transmission / Underground | ||
1. | 33KV Overhead Transmission Lines for Kuching & Sibu | Installation including Civil Works | Jan 1977 - Dec 1978 |
2. | Supply and Install 33KV Overhead Conductors & Access at Bintulu | Electrical Works | Aug 1979 - Dec 1979 |
3. | KTMB Double Tracking Electrification Project in Selangor Darul Ehsan | Supply, Installation and Commissioning of 132KV XLPE Underground Cables | Mar 2003 - Dec 2005 |
B. | Power Station | ||
1. | Sungai Biawak Power Station | Lighting and Small Power Installation | Mar 1978 - Jul 1978 |
2. | Paka Power Station (Phase II) | Low Tension, Air-conditioning and Plumbing Services | Dec 1983 - Apr 1985 |
3. | 3 x 700MW Coal-Fired Power Plant, Tanjung Bin, Johor | Mechanical and Electrical Works | Jan 2004 - Aug 2007 |
C. | Steel Structure | ||
1. | The Construction, Installation, Testing, Commissioning and Maintenance of Reefer Stacks and Associated M&E Works | Maintenance of Reefer Stacks and Associated M&E Works | Dec 2002 - May 2003 |
2. | Reefer Stacks and Associated Mechanical and Electrical Works | Maintenance of Reefer Stacks and Associated M&E Works | Oct 2000 - Dec 2000 |
3. | SMDS Solidification Plant | Steel Structure, Equipment and Machinery Installation, Electrical Installation | Apr 1992 - Mar 1993 |
D. | Substation -11kV to 33kV Substation | ||
1. | NEG Phase III | 33KV Power Supply, 11KV/3.3KV, 11KV/415V Sub-Station System and Generator Set Installation | Jun 1994 - Dec 1994 |
2. | Matsushita Electronics Corp | 33KV and 11KV Sub- Station Equipment and Cabling Works | Jul 1995 - Feb 1996 |
3. | KLIA - UT-02 | Substation Equipment for Electrical Reticulation for 33KV & 11KV System | Nov 1995 - Dec 1997 |
4. | MAS-KLIA (Catering Complex) | Electrical HT & LV, Standby Generator & Telephone | Aug 1996 - Jan 1997 |
5. | Fuji Electric Factory | Electircal Services 33KV, 11KV & 415V | Mar 1997 - Nov 1997 |
6. | Sony Technology (M) Sdn Bhd | 33KV Sub-station | Apr 2000 - May 2001 |
7. | Nippon Electric Glass | 33KV, 11KV & 415V Electrical Works | Oct 2000 - Sept 2001 |
8. | Propane Dehydrogenation Project | Electrical & Instrumentation Works | Jul 1999 - Sept 2001 |
9. | Proposed 33/11KV Main-Intake Substation and Upgrading of Existing 11KV Distribution System | Elecrical Services | Dec 2007 - Oct 2008 |
10. | Kelang - Jajaran Sungai Buloh - Kajang Underground Works (Tunnels, Stations & Associated Structures) Between North Portal Semantan And Maluri South Portal | 33KV Switchgear System | Jun 2012 - Apr 2013 |
66kV Substation | |||
1. | University Malaysia Sabah | 66 KV Main Intake Sub-station Electrical Equipment Installation Works | Jan 1997 - Mar 1999 |
132kV Substation | |||
1. | Peninsular Gas Utilisation Project ~ Gas Processing Plants 5 & 6 Pipelines & Marine Terminal | Electrical Works (Up to 132KV System) | Oct 1996 - Jun 1999 |
230kV Substation | |||
1. | Engineering, Procurement and Construction for Siam Power Generation Public Company Ltd - 230Kv Switchyard, Baan Khai, Rayong Province | Electrical Services | Sept 2009 - Jan 2010 |
500kV Substation | |||
1. | 2 X 700MW Coal Fired Independent Power Plant in Kuala Lukut, Mukim Jimah, District of Port Dickson, Negeri Sembilan Darul Khusus | Design, Construct and complete Extra High Voltage Electrical Work at Interconnection Facilities Switchyard | Jan 2006 - April 2008 |
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | Design, Construction, Completion and Commissioning of Integrated Customs, Immigration and Quarantine Complex (CIQ-05) Johor Bahru, Johor | Mechanical Works | Sept 2003 - Dec 2008 |
2. | Design, Construction, Completion and Commissioning of Integrated Customs, Immigration and Quarantine Complex (CIQ-06) Johor Bahru, Johor | Electrical Works | Sept 2003 - Dec 2008 |
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | Remaining and Reinstatement works for partly completed 5-Star International Hotel at K-5, Hanoi | Building, ID, FFNB, all Mechanical & Electrical Works and External Works | Mar 2003 - Oct 2003 |
2. | The Completion of the Intercontinental Westlake Hotel Nghi Tam Village, Hanoi, Vietnam | Turnkey contract for the rehabilitation, upgrade and completion of Architectural, ID, M&E & Landscape services | July 2005 - Dec 2007 |
NO | NAME OF PROJECT | NATURE OF WORK | COMMENCEMENT AND COMPLETION |
1. | Ayer Keroh-KL Expressway Toll Collection Station | Electrical Installation | Jul 1986 - Mar 1987 |
2. | Construction of KL Sewage Treatment Plant Project Phase 1 Package 1 : Sewer Networks | Pipe Jacking Works | Jan 2004 - Mar 2008 |
3. | Temporary power supply for construction of IB Tower at Jalan Binjai, Kuala Lumpur | Electrical Services | Apr 2012 - Sept 2012 |
4. | Proposed construction of a single-storey warehouse with a two-storey office block for Toyota Tsusho (M) Sdn Bhd on part of Lot PT216, Jalan Keluli 2 (KU05) Prime Bukit Raja Industrial Park, Klang Bandar Diraja, Selangor, Malaysia | Electrical Services | Aug 2012 - Mar 2013 |